{"id":1695,"date":"2026-08-04T10:52:58","date_gmt":"2026-08-04T16:52:58","guid":{"rendered":"https:\/\/jarrstech.com\/?p=1695"},"modified":"2026-09-10T16:39:42","modified_gmt":"2026-09-10T22:39:42","slug":"energias-renovables","status":"publish","type":"post","link":"https:\/\/jarrstech.com\/en\/energias-renovables\/","title":{"rendered":"Renewable Energies"},"content":{"rendered":"<h2 class=\"wp-block-heading has-vivid-cyan-blue-color has-text-color has-link-color wp-elements-1\">Regulatory Feasibility and Binding Planning<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Under the new rules, no project can move forward unless it is aligned with the State&#039;s planning.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Suitability Assessment in SENER\/CNE Calls for Proposals:<\/strong>\u00a0Comprehensive advice to participate in the new calls for renewable energy generation launched by the government for the incorporation of private capacity (aligned with the national goals to 2030).<\/li>\n\n\n\n<li><strong>Network and Injection Constraint Analysis:<\/strong>\u00a0Preliminary studies based on the maximum interconnection capacities published by CENACE to identify nodes with absorption capacity and low risk of congestion or \u201ccurtailment\u201d (generation cuts).<\/li>\n\n\n\n<li><strong>Management under the New Single Window for Self-Consumption:<\/strong>\u00a0Advice and priority and simultaneous processing for on-site industrial projects (from 0.7 MW to 20 MW) under the guidelines of the single window, optimizing the times of obtaining permits before the CNE and CFE.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image is-resized\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"1024\" src=\"https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/renovable-1.png\" alt=\"Proceso de 3 pasos para alinear proyectos a la planeaci\u00f3n estatal: Evaluaci\u00f3n de idoneidad, An\u00e1lisis de restricciones de red y Ventanilla \u00fanica\" class=\"wp-image-621\" style=\"aspect-ratio:1;width:800px;height:auto\" srcset=\"https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/renovable-1.png 1024w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/renovable-1-300x300.png 300w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/renovable-1-150x150.png 150w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/renovable-1-768x768.png 768w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading has-vivid-cyan-blue-color has-text-color has-link-color wp-elements-2\">Project Development (Engineering and Technical Studies)<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Technical structuring that guarantees the performance and safety of the asset from its conception.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Solar and Wind Resource Studies:<\/strong>\u00a0Climatological modeling, on-site measurement campaigns and advanced energy simulations (using software such as PVSyst or WindPRO) to determine the net performance of the project (P50, P90).<\/li>\n\n\n\n<li><strong>Interconnection Engineering and Grid Code for Renewables:<\/strong>\u00a0Design of step-up substations and overhead\/underground transmission lines strictly complying with the power quality and voltage support criteria required for power plants by the current Grid Code.<\/li>\n\n\n\n<li><strong>Hybridization and Storage (BESS):<\/strong>\u00a0Technical and economic sizing of battery systems coupled to solar or wind power plants to comply with the &quot;firm energy&quot; guidelines with storage requested by the CFE in the new contracts.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<figure class=\"wp-block-image is-resized\"><img decoding=\"async\" width=\"1024\" height=\"1024\" data-src=\"https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/renovables-2.png\" alt=\"Estructuraci\u00f3n t\u00e9cnica para activos de renovables: 1. Estudios de recurso solar y e\u00f3lico, 2. Ingenier\u00eda de interconexi\u00f3n y C\u00f3digo de Red, 3. Hibridaci\u00f3n y almacenamiento (BESS)\" class=\"wp-image-622 lazyload\" style=\"--smush-placeholder-width: 1024px; --smush-placeholder-aspect-ratio: 1024\/1024;aspect-ratio:1;width:800px;height:auto\" data-srcset=\"https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/renovables-2.png 1024w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/renovables-2-300x300.png 300w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/renovables-2-150x150.png 150w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/renovables-2-768x768.png 768w\" data-sizes=\"(max-width: 1024px) 100vw, 1024px\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" \/><\/figure>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading has-vivid-cyan-blue-color has-text-color has-link-color wp-elements-3\">Social, Environmental and Energy Justice Consulting<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The social component is currently the most rigorous filter for the authorization of any renewable energy plant.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Preparation of the Social Impact Statement (MISSE):<\/strong>\u00a0Development of the social study under the latest provisions of the SENER, with a strict focus on mitigation measures, human rights and methodological design of the prior consultation in communities.<\/li>\n\n\n\n<li><strong>Environmental Impact Assessments (EIA) and Land Use Change:<\/strong>\u00a0Processing and development of Environmental Impact Statements before SEMARNAT, including studies of flora, fauna and rescue of endemic species.<\/li>\n\n\n\n<li><strong>Right-of-Way Management and Surface Leases:<\/strong>\u00a0Technical and legal negotiation of usufruct contracts, easements and acquisition of land suitable for large-scale projects.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<figure class=\"wp-block-image is-resized\"><img decoding=\"async\" width=\"1024\" height=\"1024\" data-src=\"https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/renovables-3.png\" alt=\"Filtro social para renovables: 1. Elaboraci\u00f3n de la MISSE y consulta previa, 2. Estudios de Impacto Ambiental (MIA), y 3. Gesti\u00f3n de derechos de v\u00eda y terrenos\" class=\"wp-image-623 lazyload\" style=\"--smush-placeholder-width: 1024px; --smush-placeholder-aspect-ratio: 1024\/1024;aspect-ratio:1;width:800px;height:auto\" data-srcset=\"https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/renovables-3.png 1024w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/renovables-3-300x300.png 300w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/renovables-3-150x150.png 150w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/renovables-3-768x768.png 768w\" data-sizes=\"(max-width: 1024px) 100vw, 1024px\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" \/><\/figure>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading has-vivid-cyan-blue-color has-text-color has-link-color wp-elements-4\">Marketing, PPAs and Market Strategy<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Ensure the bankability of the project through solid contracts and efficient management of the Wholesale Electricity Market (MEM).<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Structuring Bilateral Contracts (Renewable PPAs):<\/strong>\u00a0Design and negotiation of long-term power purchase agreements between private generators and Large Industrial Users (Qualified Load Centers), protecting tariffs against volatility.<\/li>\n\n\n\n<li><strong>Legacy Permission Migration (PIE):<\/strong>\u00a0Strategic advice for clean generation plants seeking to comply with the voluntary migration guidelines to transition from the previous model to the Electricity Sector Law (LSE) in coordination with CFE and CNE.<\/li>\n\n\n\n<li><strong>Strategy in the Clean Energy Certificates (CELs) Market:<\/strong>\u00a0Registration of the central office with the CNE for the accreditation of CELs and consulting for their subsequent commercialization in the spot market or through contracts for coverage of associated products.<\/li>\n<\/ul>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<figure class=\"wp-block-image is-resized\"><img decoding=\"async\" width=\"1024\" height=\"1024\" data-src=\"https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/renovables-4.png\" alt=\"Infograf\u00eda: Pasos para bancabilidad en el MEM mediante contratos PPAs, migraci\u00f3n de permisos legados y gesti\u00f3n de CELs\" class=\"wp-image-627 lazyload\" style=\"--smush-placeholder-width: 1024px; --smush-placeholder-aspect-ratio: 1024\/1024;aspect-ratio:1;width:800px;height:auto\" data-srcset=\"https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/renovables-4.png 1024w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/renovables-4-300x300.png 300w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/renovables-4-150x150.png 150w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/renovables-4-768x768.png 768w\" data-sizes=\"(max-width: 1024px) 100vw, 1024px\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" \/><\/figure>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading has-vivid-cyan-blue-color has-text-color has-link-color wp-elements-5\">Operation and Management of Renewable Assets (Asset Management)<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Maximizing the asset&#039;s useful life cycle and efficiency in daily dispatch to CENACE.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Commercial Offering Strategies for Renewables in the MEM:<\/strong>\u00a0Mathematical modeling and predictive analytics of generation (wind\/radiation forecasts) to structure daily offers in the Anticipation Day Market (ADM), minimizing penalties for deviations in the Real Time Market (RTM).<\/li>\n\n\n\n<li><strong>Operational Performance Audits:<\/strong>\u00a0Evaluation of photovoltaic module degradation, inverter efficiency, or wind turbine fatigue to implement predictive maintenance plans.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image is-resized\"><img decoding=\"async\" width=\"1024\" height=\"1024\" data-src=\"https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/renovables-5.png\" alt=\"Procesos para maximizar la vida \u00fatil de activos renovables y optimizar el despacho diario de energ\u00eda ante el CENACE\" class=\"wp-image-628 lazyload\" style=\"--smush-placeholder-width: 1024px; --smush-placeholder-aspect-ratio: 1024\/1024;aspect-ratio:1;width:800px;height:auto\" data-srcset=\"https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/renovables-5.png 1024w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/renovables-5-300x300.png 300w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/renovables-5-150x150.png 150w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/renovables-5-768x768.png 768w\" data-sizes=\"(max-width: 1024px) 100vw, 1024px\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" \/><\/figure>","protected":false},"excerpt":{"rendered":"<p>Under the current energy policy, the integration of renewables requires strategic alignment with state objectives, the reliability of the CENACE national grid, and a strong social commitment.<\/p>","protected":false},"author":2,"featured_media":255,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"energias,renovables","_eb_attr":"","wpai_generated_summary":"","footnotes":""},"categories":[10],"tags":[],"class_list":["post-1695","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-notas-tecnicas"],"acf":[],"_links":{"self":[{"href":"https:\/\/jarrstech.com\/en\/wp-json\/wp\/v2\/posts\/1695","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jarrstech.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/jarrstech.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/jarrstech.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/jarrstech.com\/en\/wp-json\/wp\/v2\/comments?post=1695"}],"version-history":[{"count":20,"href":"https:\/\/jarrstech.com\/en\/wp-json\/wp\/v2\/posts\/1695\/revisions"}],"predecessor-version":[{"id":2329,"href":"https:\/\/jarrstech.com\/en\/wp-json\/wp\/v2\/posts\/1695\/revisions\/2329"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/jarrstech.com\/en\/wp-json\/wp\/v2\/media\/255"}],"wp:attachment":[{"href":"https:\/\/jarrstech.com\/en\/wp-json\/wp\/v2\/media?parent=1695"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/jarrstech.com\/en\/wp-json\/wp\/v2\/categories?post=1695"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/jarrstech.com\/en\/wp-json\/wp\/v2\/tags?post=1695"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}