{"id":1635,"date":"2026-08-04T10:25:00","date_gmt":"2026-08-04T16:25:00","guid":{"rendered":"https:\/\/jarrstech.com\/?p=1635"},"modified":"2026-09-10T16:41:36","modified_gmt":"2026-09-10T22:41:36","slug":"normatividad-electrica","status":"publish","type":"post","link":"https:\/\/jarrstech.com\/en\/normatividad-electrica\/","title":{"rendered":"Electrical Regulations"},"content":{"rendered":"<h2 class=\"wp-block-heading has-vivid-cyan-blue-color has-text-color has-link-color wp-elements-1\">Strategic Consulting in the face of the New Electricity Sector Law (LSE)<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Services geared towards transition and protection against the new regulatory framework.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Regulatory Transition Diagnosis:<\/strong>\u00a0Impact analysis of the new LSE Regulations and the Administrative Provisions of the National Energy Commission (CNE) on current contracts, previous permits of the defunct CRE and new projects.<\/li>\n\n\n\n<li><strong>Supply and Self-Consumption Model Strategy:<\/strong>\u00a0Technical and legal advice for migrating or structuring schemes under the new guidelines of\u00a0<strong>Self-consumption<\/strong>\u00a0(which replace previous concepts such as isolated supply) and the new rules for on-site Generation contracts for the Wholesale Electricity Market (MEM).<\/li>\n\n\n\n<li><strong>Distributed Generation (DG) Assessment:<\/strong>\u00a0Consulting on the increase in the thresholds for exempt generators (the new regulatory limit to operate without a permit from the CNE) and the new schemes of compensation and sale of surpluses through Qualified Service Suppliers or the Basic Service Supplier (CFE).<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"1024\" src=\"https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/normatividad-1.png\" alt=\"Servicios de transici\u00f3n y blindaje regulatorio: Diagn\u00f3stico de transici\u00f3n regulatoria, Estrategia de suministro y autoconsumo, y Evaluaci\u00f3n de Generaci\u00f3n Distribuida\" class=\"wp-image-588\" srcset=\"https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/normatividad-1.png 1024w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/normatividad-1-300x300.png 300w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/normatividad-1-150x150.png 150w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/normatividad-1-768x768.png 768w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading has-vivid-cyan-blue-color has-text-color has-link-color wp-elements-2\">Management of Permits, Procedures and Corporate Compliance<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">comprehensive support at the one-stop shop and document management before CNE, SENER and CENACE.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Management and Obtaining Generation and Supply Permits:<\/strong>\u00a0Integration of files, alignment with the Electricity Sector Development Plan (PLADESE) and fulfillment of requirements before the Electricity Unit of the CNE.<\/li>\n\n\n\n<li><strong>Social Impact Assessment (MISSE) and Prior Consultation:<\/strong>\u00a0Coordination and preparation of social impact studies for electrical infrastructure, as well as the methodological design of the consultative and deliberative phases required by SENER for large-scale projects (excluding self-consumption projects of less than 20 MW in isolated mode).<\/li>\n\n\n\n<li><strong>Environmental Impact Assessment (EIA):<\/strong>\u00a0Regulatory management in matters of environmental sustainability required by SEMARNAT for the viability of power plants and substations.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"1024\" height=\"1024\" data-src=\"https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/normativida-2.png\" alt=\"Proceso de gesti\u00f3n ante CNE, SENER y CENACE en tres etapas: permisos de generaci\u00f3n, impacto social (MISSE) e impacto ambiental (MIA)\" class=\"wp-image-589 lazyload\" data-srcset=\"https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/normativida-2.png 1024w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/normativida-2-300x300.png 300w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/normativida-2-150x150.png 150w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/normativida-2-768x768.png 768w\" data-sizes=\"(max-width: 1024px) 100vw, 1024px\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 1024px; --smush-placeholder-aspect-ratio: 1024\/1024;\" \/><\/figure>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading has-vivid-cyan-blue-color has-text-color has-link-color wp-elements-3\">Operational Regulations, Connection and Interconnection (CENACE)<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Guarantee technical and commercial access to the National Electric System (SEN) under the principles of binding planning.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Connection and Interconnection Studies:<\/strong>\u00a0Consulting and simulation of flows for the submission of applications to CENACE, evaluating the maximum interconnection capacities published and the reinforcements required in the National Transmission Network (RNT) and General Distribution Networks (RGD).<\/li>\n\n\n\n<li><strong>Interconnection and Representation Agreements in the MEM:<\/strong>\u00a0Regulatory support for the signing of interconnection contracts and the mandatory representation in the Wholesale Electricity Market through a Participating Generating Company.<\/li>\n\n\n\n<li><strong>Market Operational Provisions (DOM) Audit:<\/strong>\u00a0Verification of daily and monthly compliance with MEM rules, validating billing, collection of regulated operating fees from CENACE and settlements.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"1024\" height=\"1024\" data-src=\"https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/normatividad-3.png\" alt=\"Acceso t\u00e9cnico y comercial al SEN: estudios de conexi\u00f3n, contratos en el MEM y auditor\u00eda de cumplimiento DOM\" class=\"wp-image-591 lazyload\" data-srcset=\"https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/normatividad-3.png 1024w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/normatividad-3-300x300.png 300w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/normatividad-3-150x150.png 150w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/normatividad-3-768x768.png 768w\" data-sizes=\"(max-width: 1024px) 100vw, 1024px\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 1024px; --smush-placeholder-aspect-ratio: 1024\/1024;\" \/><\/figure>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading has-vivid-cyan-blue-color has-text-color has-link-color wp-elements-4\">Official Mexican Standards for Safety and Infrastructure (NOMs)<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Technical compliance of the facilities on site to ensure operational safety and avoid closure.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Ruling under NOM-001-SEDE (Electrical Installations):<\/strong>\u00a0Coordination with Inspection Units (UI) to verify that the design and construction of substations and internal networks comply with national safety standards.<\/li>\n\n\n\n<li><strong>Compliance with NOM-029-STPS (Maintenance of Electrical Installations):<\/strong>\u00a0Consulting services for the creation of security plans, lockout\/tagout (LOTO) procedures, and delivery of Certificates of Labor Competencies (<strong>DC-3<\/strong>) for the operational technical staff.<\/li>\n\n\n\n<li><strong>STPS Regulatory Compliance for Suppliers (REPSE):<\/strong>\u00a0Specialized consulting in the correct structuring of the REPSE Annex for contracting companies in the energy sector, ensuring positive opinions before the SAT, IMSS, INFONAVIT and avoiding the non-deductibility of ISR or losses in the crediting of IVA.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<figure class=\"wp-block-image is-resized\"><img decoding=\"async\" width=\"1024\" height=\"1024\" data-src=\"https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/normatividad-4.png\" alt=\"Garant\u00eda de cumplimiento t\u00e9cnico y seguridad operativa: dictaminaci\u00f3n NOM-001-SEDE, NOM-029-STPS y cumplimiento REPSE\" class=\"wp-image-592 lazyload\" style=\"--smush-placeholder-width: 1024px; --smush-placeholder-aspect-ratio: 1024\/1024;aspect-ratio:1;width:800px;height:auto\" data-srcset=\"https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/normatividad-4.png 1024w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/normatividad-4-300x300.png 300w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/normatividad-4-150x150.png 150w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/normatividad-4-768x768.png 768w\" data-sizes=\"(max-width: 1024px) 100vw, 1024px\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" \/><\/figure>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading has-vivid-cyan-blue-color has-text-color has-link-color wp-elements-5\">Contractual and Tariff Compliance Audits<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Mitigation of financial risks associated with regulated tariffs and purchase and sale agreements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Technical Expert Reports and Energy Arbitration:<\/strong>\u00a0Expert support services in regulatory or contractual disputes (PPAs) arising from regulatory changes or interpretations of market principles.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Audit and Optimization of CFE Billing:<\/strong>\u00a0Regulatory analysis of basic supply tariffs (GDMTH, DIST, DIT) to identify erroneous charges for billable demand, power charges or penalties.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Monitoring Power Factor Transition Compliance:<\/strong>\u00a0Strategic consulting to ensure that the Load Center maintains the new parameter required in the Network Code (0.95 to 0.97 according to the corresponding transient) the 95% of the time in five-minute measurements to avoid severe monthly penalties.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<figure class=\"wp-block-image is-resized\"><img decoding=\"async\" width=\"1024\" height=\"1024\" data-src=\"https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/normatividad-5.png\" alt=\"Garant\u00eda de cumplimiento t\u00e9cnico y seguridad operativa: NOM-001-SEDE, NOM-029-STPS y cumplimiento REPSE ante SAT, IMSS e INFONAVIT\" class=\"wp-image-593 lazyload\" style=\"--smush-placeholder-width: 1024px; --smush-placeholder-aspect-ratio: 1024\/1024;aspect-ratio:1;width:800px;height:auto\" data-srcset=\"https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/normatividad-5.png 1024w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/normatividad-5-300x300.png 300w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/normatividad-5-150x150.png 150w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/normatividad-5-768x768.png 768w\" data-sizes=\"(max-width: 1024px) 100vw, 1024px\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" \/><\/figure>","protected":false},"excerpt":{"rendered":"<p>Today, complying with regulations involves not only engineering, but also a legal, operational, and commercial strategy to mitigate regulatory risks and optimize costs.<\/p>","protected":false},"author":2,"featured_media":1634,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"normatividad,electrica","_eb_attr":"","wpai_generated_summary":"","footnotes":""},"categories":[10],"tags":[],"class_list":["post-1635","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-notas-tecnicas"],"acf":[],"_links":{"self":[{"href":"https:\/\/jarrstech.com\/en\/wp-json\/wp\/v2\/posts\/1635","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jarrstech.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/jarrstech.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/jarrstech.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/jarrstech.com\/en\/wp-json\/wp\/v2\/comments?post=1635"}],"version-history":[{"count":31,"href":"https:\/\/jarrstech.com\/en\/wp-json\/wp\/v2\/posts\/1635\/revisions"}],"predecessor-version":[{"id":2332,"href":"https:\/\/jarrstech.com\/en\/wp-json\/wp\/v2\/posts\/1635\/revisions\/2332"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/jarrstech.com\/en\/wp-json\/wp\/v2\/media\/1634"}],"wp:attachment":[{"href":"https:\/\/jarrstech.com\/en\/wp-json\/wp\/v2\/media?parent=1635"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/jarrstech.com\/en\/wp-json\/wp\/v2\/categories?post=1635"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/jarrstech.com\/en\/wp-json\/wp\/v2\/tags?post=1635"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}