{"id":1546,"date":"2026-08-03T19:51:04","date_gmt":"2026-08-04T01:51:04","guid":{"rendered":"https:\/\/jarrstech.com\/?p=1546"},"modified":"2026-09-10T16:43:56","modified_gmt":"2026-09-10T22:43:56","slug":"operatividad-energetica","status":"publish","type":"post","link":"https:\/\/jarrstech.com\/en\/operatividad-energetica\/","title":{"rendered":"Energy Operation"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Operating in the Wholesale Electricity Market (MEM) requires strict control of financial transactions and compliance with the dispatch rules issued by CENACE. Operations are no longer a static process; they are a daily strategy of optimizing technical and economic data.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-vivid-cyan-blue-color has-text-color has-link-color wp-elements-1\">Dispatch Offer Management and Daily Operation (Generators)<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Services aimed at maximizing the revenue of Power Plants through efficient participation in the Day-for-Date Market (DfD) and the Real-Time Market (RTM).<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Energy Offer Strategy and Modeling:<\/strong>\u00a0Daily preparation of sales offers (price-quantity curves) parameterized according to the opportunity costs of the plant (fuels, water, technical restrictions) and the new provisions for Cogeneration and combined cycle power plants.<\/li>\n\n\n\n<li><strong>Economic Dispatch Limit Management:<\/strong>\u00a0Operational configuration before CENACE of the minimum and maximum blocks of dispatchable energy, coordinating the physical variables of the plant with the mandatory stability requirements of the National Transmission Network (RNT).<\/li>\n\n\n\n<li><strong>Monitoring of Local Marginal Prices (LMP):<\/strong>\u00a0Real-time analysis of PML variations by connectivity node to identify windows of opportunity or risks of losses due to congestion in the SEN.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"1024\" src=\"https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/opratividad-1.png\" alt=\"Ingeniero usando una tableta para analizar curvas de oferta de generaci\u00f3n en un centro de control de CENACE\" class=\"wp-image-559\" srcset=\"https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/opratividad-1.png 1024w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/opratividad-1-300x300.png 300w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/opratividad-1-150x150.png 150w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/opratividad-1-768x768.png 768w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading has-vivid-cyan-blue-color has-text-color has-link-color wp-elements-2\">Management and Settlement in the Wholesale Electricity Market (MEM)<br><br><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Essential \u201cBack Office\u201d services to audit and ensure that every Megawatt-hour (MWh) injected or withdrawn is billed correctly.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Audit and Reconciliation of Settlement Statements (ECL):<\/strong>\u00a0Thorough review of daily, weekly, and monthly account statements issued by CENACE. Detection and correction of discrepancies in charges\/payments for energy, power, Ancillary Services, and Financial Transmission Rights (DFT).<\/li>\n\n\n\n<li><strong>Dispute and Claim Management before CENACE:<\/strong>\u00a0Preparation of technical-mathematical support and formal representation in the clarification processes before the market operator in the face of measurement errors, incorrect price assignments or undue charges for deviations.<\/li>\n\n\n\n<li><strong>Commercial Transaction Measurement System (SMTC) Administration:<\/strong>\u00a0Operational assurance that the meters at the Connection Point transmit data in real time to CENACE without interruptions, coordinating the mandatory periodic calibrations.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"1024\" height=\"1024\" data-src=\"https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/operatividad-2.png\" alt=\"T\u00e9cnico interactuando con una interfaz digital de gesti\u00f3n del Mercado El\u00e9ctrico Mayorista en un gabinete de control\" class=\"wp-image-561 lazyload\" data-srcset=\"https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/operatividad-2.png 1024w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/operatividad-2-300x300.png 300w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/operatividad-2-150x150.png 150w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/operatividad-2-768x768.png 768w\" data-sizes=\"(max-width: 1024px) 100vw, 1024px\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 1024px; --smush-placeholder-aspect-ratio: 1024\/1024;\" \/><\/figure>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading has-vivid-cyan-blue-color has-text-color has-link-color wp-elements-3\">Procurement and Operational Optimization Strategy for Load Centers<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Services designed to help Large Industrial Consumers mitigate market volatility and reduce their operating costs.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Operational Management of Electricity Coverage Contracts (PPAs):<\/strong>\u00a0Continuous monitoring of compliance with bilateral energy purchase contracts, evaluating the behavior of the supplier (e.g., CFE Qualified or private) against the conditions indexed to the PML or regulated tariffs.<\/li>\n\n\n\n<li><strong>Load Shifting Strategies (<em>Demand Response<\/em>):<\/strong>\u00a0Analysis of the hourly consumption profiles of industrial plants to design operational strategies that move high-demand processes out of peak hours, drastically reducing billable demand charges.<\/li>\n\n\n\n<li><strong>Scenario Simulation and Demand Forecasting (Mathematical Models):<\/strong>\u00a0Implementation of predictive analytics tools to estimate the plant&#039;s weekly and monthly consumption, allowing the Qualified Supplier to nominate the exact energy and avoid penalties for energy deviations before CENACE.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"1024\" height=\"1024\" data-src=\"https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/operatividad-3.png\" alt=\"Estrategia de optimizaci\u00f3n para centros de carga: gesti\u00f3n de PPAs, desplazamiento de demanda y pron\u00f3sticos para el CENACE\" class=\"wp-image-562 lazyload\" data-srcset=\"https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/operatividad-3.png 1024w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/operatividad-3-300x300.png 300w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/operatividad-3-150x150.png 150w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/operatividad-3-768x768.png 768w\" data-sizes=\"(max-width: 1024px) 100vw, 1024px\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 1024px; --smush-placeholder-aspect-ratio: 1024\/1024;\" \/><\/figure>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading has-vivid-cyan-blue-color has-text-color has-link-color wp-elements-4\">Operational Management of Associated Products and Related Services<br><br><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Maximize asset value by marketing non-energy electrical attributes.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Power Market Operation (Pre-MIE):<\/strong>\u00a0Operational management for the allocation and sale of capacity (Power) of power plants during the Critical Evaluation Hours determined by CENACE, guaranteeing fixed annual income for reliability.<\/li>\n\n\n\n<li><strong>Monitoring and Transaction of Clean Energy Certificates (CELs):<\/strong>\u00a0Management of the CEL portfolio for clean generators (registration and validation) or compliance with annual operational obligations for the Responsible Load Entities (Qualified Suppliers and Users).<\/li>\n\n\n\n<li><strong>Monitoring of Related Services Not Included in the MEM (SCNMEM):<\/strong>\u00a0Operational optimization for plants capable of providing frequency regulation, voltage support (reactive power) or black start, charging the regulated rates authorized by the CNE.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"1024\" height=\"1024\" data-src=\"https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/normatividad-4.png\" alt=\"Garant\u00eda de cumplimiento t\u00e9cnico y seguridad operativa: dictaminaci\u00f3n NOM-001-SEDE, NOM-029-STPS y cumplimiento REPSE\" class=\"wp-image-592 lazyload\" data-srcset=\"https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/normatividad-4.png 1024w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/normatividad-4-300x300.png 300w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/normatividad-4-150x150.png 150w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/normatividad-4-768x768.png 768w\" data-sizes=\"(max-width: 1024px) 100vw, 1024px\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 1024px; --smush-placeholder-aspect-ratio: 1024\/1024;\" \/><\/figure>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading has-vivid-cyan-blue-color has-text-color has-link-color wp-elements-5\">Operational Migration and Legacy Contract Transition<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Critical support for companies that must abandon old schemes due to expiration or changes in the regulatory framework.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Migration Engineering from Self-Supply to MEM:<\/strong>\u00a0Managing the operational exit process of Legacy Self-Supply Permits towards the competitive model of the MEM or new on-site Self-Consumption modalities, minimizing the impact on electricity transmission costs and avoiding disconnection periods.<\/li>\n\n\n\n<li><strong>Operational Behavior Testing (Market Commissioning):<\/strong>\u00a0Technical coordination of the real-time tests required by CENACE for a new generation plant or a large load center to receive the \u201cCommercial Operation Declaration\u201d (COD).<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"1024\" height=\"1024\" data-src=\"https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/operatividad-5.png\" alt=\"Diagrama del proceso de migraci\u00f3n operativa y transici\u00f3n de contratos legados al Mercado El\u00e9ctrico Mayorista\" class=\"wp-image-564 lazyload\" data-srcset=\"https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/operatividad-5.png 1024w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/operatividad-5-300x300.png 300w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/operatividad-5-150x150.png 150w, https:\/\/jarrstech.com\/wp-content\/uploads\/2026\/05\/operatividad-5-768x768.png 768w\" data-sizes=\"(max-width: 1024px) 100vw, 1024px\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 1024px; --smush-placeholder-aspect-ratio: 1024\/1024;\" \/><\/figure>","protected":false},"excerpt":{"rendered":"<p>Operational efficiency represents the heart of daily profitability and technical continuity, both for Market Participants (Generators and Suppliers) and for Large Users (Qualified Load Centers).<\/p>","protected":false},"author":2,"featured_media":1547,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"operatividad,gestion","_eb_attr":"","wpai_generated_summary":"","footnotes":""},"categories":[10],"tags":[],"class_list":["post-1546","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-notas-tecnicas"],"acf":[],"_links":{"self":[{"href":"https:\/\/jarrstech.com\/en\/wp-json\/wp\/v2\/posts\/1546","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jarrstech.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/jarrstech.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/jarrstech.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/jarrstech.com\/en\/wp-json\/wp\/v2\/comments?post=1546"}],"version-history":[{"count":42,"href":"https:\/\/jarrstech.com\/en\/wp-json\/wp\/v2\/posts\/1546\/revisions"}],"predecessor-version":[{"id":2334,"href":"https:\/\/jarrstech.com\/en\/wp-json\/wp\/v2\/posts\/1546\/revisions\/2334"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/jarrstech.com\/en\/wp-json\/wp\/v2\/media\/1547"}],"wp:attachment":[{"href":"https:\/\/jarrstech.com\/en\/wp-json\/wp\/v2\/media?parent=1546"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/jarrstech.com\/en\/wp-json\/wp\/v2\/categories?post=1546"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/jarrstech.com\/en\/wp-json\/wp\/v2\/tags?post=1546"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}